MASTER PLANNING & FEASIBILITY STUDY

 
 
 
 

MASTER PLANNING & FEASIBILITY STUDY


Scope of Services
ABERDEEN shall execute the assignment across the following core phases and workstreams:

 

Phase 1: Inception & Baseline Assessment

Site & Data Review: Review existing studies, topographical surveys, land titles, zoning regulations, and utility maps.

Site Investigations: Conduct physical site inspections, preliminary geotechnical/hydrological assessments, and environmental baseline surveys.

Stakeholder Management: Engage with key internal stakeholders, local authorities, utility providers, and community representatives to align on project goals and regulatory constraints.

 

Phase 2: Market & Demand Analysis

Macro & Sector Overview: Analyze regional economic trends, demographic projections, and sector-specific drivers.

Supply & Demand Assessment: Evaluate existing and pipeline competition, pricing benchmarks, absorption rates, and unmet market gaps.

Product Mix & Positioning: Recommend optimal land uses, target user segments, facility sizing, and value-add differentiators. 

 

Phase 3: Master Planning & Conceptual Design

Development Vision & Concept: Formulate 2–3 alternative spatial development concepts based on market findings and site constraints.

Preferred Master Plan: Develop the selected option into a detailed Master Plan covering:Land-use zoning, density, and floor area ratio (FAR) allocations.

*Internal circulation, access points, parking, and traffic impact mitigation.

*Utility infrastructure strategy (water, power, wastewater, telecom, stormwater).

*Sustainability, green building, and climate-resilience guidelines.

Phasing Strategy: Define logical development phases aligned with projected market absorption and capital availability.

 

Phase 4: Technical, Legal & Environmental Feasibility

Technical & Engineering Viability: Confirm constructability, infrastructure tie-in requirements, and preliminary engineering standards.

Regulatory & Legal Compliance: Identify required permits, zoning variances, land-use approvals, and statutory timelines.

Environmental & Social Impact: Conduct a preliminary Environmental and Social Impact Assessment (ESIA) and identify mitigation measures. 

 

Phase 5: Financial Feasibility & Implementation Roadmap

CAPEX & OPEX Estimation: Prepare Class 4 / Order-of-Magnitude capital expenditure (land, infrastructure, construction, contingencies) and operating expenditure estimates.

Financial Modeling: Build a dynamic, unlocked financial model projecting cash flows over [15–25] years, calculating key metrics including NPV, IRR, Payback Period, and Debt Service Coverage Ratio (DSCR).

Sensitivity & Risk Analysis: Test project resilience against variations in construction costs, revenue/pricing, occupancy/absorption delays, and financing rates, accompanied by a risk mitigation matrix.

Procurement & Governance Strategy: Recommend delivery models (e.g., direct development, Joint Venture, Public-Private Partnership) and outline an actionable implementation schedule.